Outdoor Athletic & Activity Capital Levy
News and Updates
- Voters Approve Both Levies (2/13/24)
- Preliminary Capital Levy Project Schedule Announced (3/1/24)
- District Explores Elia Renufill for Turf Fields: A Cool, Sustainable and Safe Alternative to Crumb Rubber (4/1/24)
- District Considers Safe GMAX Drain Padding System for Turf Fields: Made From Recycled Material and Fully Recyclable After Use (4/3/24)
Preliminary Project Schedule
Contact
General Inquiries
E-mail: wwpslevy@wenahagroup.com
Dr. Wade Smith, Superintendent
Phone: (509) 526-6715
E-mail: wsmith@wwps.org
Voter-Approved Improvements
Improvements Included in the levy:
-
Replacing the 60-year-old tennis courts at Wa-Hi
-
Installing an all-weather track at Pioneer MS for school and community use
-
Repairing the 43-year-old Garrison tennis courts (Chubb Courts) and resurface the 20-year-old track
-
Consistent with all league schools, installing high quality artificial turf playing surfaces and field lighting (low spill/low glare) in order to maximize utilization, participation and post-season play at both the Klicker and Hayner Park fields at Wa-Hi
-
Installing outdoor lighting (low spill/low glare) at the varsity baseball and softball fields in order to minimize instructional loss and maximize family attendance
-
Installing elevated bleachers with ADA access at the Klicker Track and Field site for soccer, football and track and field spectators
-
Providing adequate access to restrooms and changing rooms
-
Constructing a JROTC "Raider Obstacle Course" for student, first responder and community use
Project Summary Drawings