A+ A A-

Updated Wa-Hi Outdoor Facilities Improvements Map

Have you seen the updated Wa-Hi site map for improved outdoor athletic and activity facilities?

Map File

Sensitive to taxpayers and current economic conditions, School Board members favored the lower-cost approach following three months of outreach, which would cost about $3 per month for every $100,000 of assessed value. For a home assessed at $300,000 the annual cost would be $114 per year or $9.50 per month through the six-year Capital Levy time frame.

The school board will finalize the Capital Levy resolution Oct. 24, which will pave the way to put the measure on the ballot February 13, 2024.

THE PROPOSED 38 CENT SHORT-TERM CAPITAL LEVY WILL:
• Replace the 60-year-old original tennis courts at Wa-Hi
• Install an all-weather track at Pioneer MS for athlete, school and community use
• Repair the 43-year-old Garrison tennis courts (Chubb Courts) and resurface the 20-year-old track
• Consistent with all league schools, install high-quality artificial turf playing surfaces and field lighting (low spill/low glare) in order to maximize utilization, participation and post-season play at both the Klicker and Hayner fields at Wa-Hi
• Install outdoor lighting (low spill/low glare) in order to minimize instructional loss and maximize family participation for baseball and softball players
• Install elevated bleachers with ADA access at the Klicker Track and Field site for soccer, football and track and field spectators
• Provide adequate access to restrooms and changing rooms for high school athletes
• Construct a JROTC "Raider Obstacle Course" for student, first responder and community use

WALLA WALLA PUBLIC SCHOOLS • 364 South Park St. • Walla Walla, WA 99362 • Phone: 509-527-3000 • Fax: 509.529.7713

Vector Solutions - Vector Alert Safe Schools Tip Line: 855.976.8772  |  Online Tip Reporting System